In 2020, the City of Waukesha hired a consultant to address current water leaks in a variety of locations at the Waukesha Police Department. After analysis and discussions with the city, it was decided to embark on a larger project to modernize all the building systems and enlarge the existing 54,000-square-foot building to 81,000 square feet along with improvements to the entire site.

JSD provided design services including schematic design, design development and final construction documents. Included in the deliverables was a dimensioned site plan, a grading and drainage plan, a utility plan for private sanitary, storm and water main service to the building and an erosion control plan.

Client

Engberg Anderson

Project Size

81,000 Square Feet

Project Cost

$17 Million

Completion Date

2022

Services Performed

Civil Engineering